1. <button id="szirn"></button>

      1. Set as homepage | Collection | Contact Us | Chinese 
        HOME ABOUT US NEWS EQUIPMENT & FACILITIES PRODUCTS MARKETING NETWORK RECRUITMENT CONTACT US
        News
        Company news
        Industry news
        Links
          China construction machinery industry association
          China tendering and bidding network
          China bidding information network
          Todays engineering machinery
          DAODA MARINE HEAVY INDUSTRY CO.,LTD
        Company news
        Daoda Offshore Wind Turbine Installation Propelled Pontoon was launched successfully

              On July 7th 2016, the Wind Turbine Installation Propelled Pontoon which was constructed by Chiefnew was launched successfully. This pontoon is a key patent platform in the method of offshore wind power one-step installation; it can transport the wind turbine (including foundation) from land to designated sea area and implement sink installation. This pontoon can transport 2 sets of finished wind turbines at one time; can realize the low consumption and fast installation of wind turbine which will bring the revolution of wind turbine installation.
               The launch of the pontoon marked that 90% of the manufacturing was completed, the next step will be the equipment testing and truss closing, estimated that will be trail voyage within one month.
               The matched 5000T gantry crane will also start the lifting work of steel leg and main girder; this project will be finished together with the pontoon simultaneously.

      2. Previous]
      3. NextChiefnew was audited for Level 3 Safety standardization by Safety Bureau
      4. Chiefnew (Nantong) Heavy Industry Co.,Ltd © Copyright All Right
        Add: No.159, Jianghai Road, NETDA, Nantong, Jiangsu, China.  Zip:226017
        Tel: 0513-85997775  Fax: 0513-85997795  E-mail:chiefnew@126.com

        ICP09019876̖

          1. <button id="szirn"></button>